Texas Instruments bq2018 Manuals

ManualLib has 2 documents for the Texas Instruments bq2018 (Other Electronics): 1 product leaflet, 1 datasheet. Every file can be read online or downloaded as a PDF for free.

Product Leaflet 1Datasheet 1

Key facts

Model
bq2018
Documents
2
Languages
EN
Last added
2012-07-03

Start here

Texas Instruments bq2018EVM Evaluation Kit Handbook

Texas Instruments bq2018EVM Evaluation Kit Handbook

Product Leaflet 1 pages · 34 KB · EN

The bq2018EVM is a complete evaluation system designed for the bq2018 Power Minder IC. It allows users to evaluate the IC's functions under various charge and discharge conditions by connecting directly to battery packs ranging from 3.5V to 18.0V. The system works with any battery pack chemistry and capacity.

Read online

Texas Instruments bq2018 specifications

Compatible ICbq2018 Power Minder IC
Battery Voltage Range3.5V-18.0V
Battery ChemistryAny
Part Numberbq2018EVM-001

Source: Texas Instruments bq2018EVM Evaluation Kit Handbook

All Texas Instruments bq2018 documents by type

Datasheet 1

Ratings, dimensions and ordering codes, for selection and design work.

Questions answered in these manuals

What is included in the bq2018EVM kit?

The kit includes a DM2018 circuit module, an EV2200 PC interface board, evaluation software disks, a PC serial cable, and a User Guide.

From: Texas Instruments bq2018EVM Evaluation Kit Handbook

Can the bq2018EVM work with any battery chemistry?

Yes, the evaluation system works with any battery pack chemistry and capacity.

From: Texas Instruments bq2018EVM Evaluation Kit Handbook

What is the bq2018?

The bq2018 is a low-cost charge/discharge counter peripheral packaged in an 8-pin TSSOP or SOIC that works with an intelligent host controller.

From: Texas Instruments bq2018 Multifunction Charge/Discharge Counter Datasheet

How does the bq2018 measure charge and discharge?

It measures the voltage drop across a low-value series sense resistor between the negative terminal of the battery and the battery pack ground contact.

From: Texas Instruments bq2018 Multifunction Charge/Discharge Counter Datasheet