Key facts
- Brand
- ABB
- Model
- ACS800
- Industry
- Industrial
- Documents
- 21
- Languages
- ZH · EN
- Last added
- 2026-10-03
Start here

ABB ACS800 Firmware Manual
This manual describes the firmware functions of the ABB ACS800 drive, including language selection, motor setup, and parameter configuration. It is intended for users who need to install, configure, and maintain the drive's firmware.
The document is organized into sections such as Compatibility, Language Selection, Motor Setup, Parameter Setting, and Operation Range. It includes step‑by‑step screens for selecting English, accessing motor nameplate data, and adjusting input and external reference parameters.
ABB ACS800 specifications
| Operation Mode | Vendor Specific (ABB drive protocol) |
|---|---|
| PPO type | PPO4 |
| PZD3 OUT | 3 |
| PZD3 IN | 6 |
Source: ABB ACS800 Series Inverter PROFIBUS-DP Control Method
All ABB ACS800 documents by type
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
How to use the product for one specific task, with worked examples.
Disassembly, diagnostics and part numbers, for repair.
- ABB ACS800-17 Hardware Manual 14 p
- ABB ACS800 Hardware Manual 134 p
- ABB ACS800-17 Hardware Manual 230 p
- ABB ACS800-37 Drive Hardware Manual 252 p
- ABB ACS800-07/U7 Hardware Manual 142 p
- ABB ACS800-31 Hardware Manual 126 p
- ABB ACS800-07 Drive Hardware Manual 138 p
- ABB ACS800-02/U2 Drive Hardware Manual 128 p
Instruction set, parameters and examples for configuring or programming the device.
Questions answered in these manuals
How should the Operation Mode be set for an ABB ACS800 inverter on PROFIBUS‑DP?
Set the Operation Mode to Vendor Specific, which selects the ABB drive protocol.
Which PPO type is required for the ACS800 inverter when using PROFIBUS‑DP?
Configure the PPO type parameter to PPO4.
Who is allowed to install and maintain the ACS800‑17 drive?
Only qualified electrical engineers may install and maintain the drive unit.
How can I verify that the drive is fully discharged before starting work?
After cutting power, wait at least five minutes, then measure the resistance between UDC+ and UDC‑ (L+ and L‑); it must be at least 1 MΩ to confirm discharge.
How long does the ABB G152 course last?
The G152 course runs for two days.
What standards does the certificate cover?
The certificate indicates compliance with CSA standards for Canada and ANSI/UL standards for the United States.
From: ABB ACS600/ACS800 Variable Speed Drive Certificate of Compliance
