ABB ACS800-17 Manuals

ManualLib has 5 documents for the ABB ACS800-17: 3 user manuals, 2 service manuals. Every file can be read online or downloaded as a PDF for free.

User Manual 3Service Manual 2

Key facts

Brand
ABB
Model
ACS800-17
Industry
Industrial
Documents
5
Languages
ZH · EN
Last added
2026-10-26

Start here

ABB ACS800-17 Quadrant Cabinet Drive Hardware Manual

ABB ACS800-17 Quadrant Cabinet Drive Hardware Manual

User Manual 206 pages · 15 MB · ZH

The document is a hardware manual for the ABB ACS800-17 four-quadrant cabinet drive with power ratings from 55 to 2500 kW. It serves as a comprehensive guide for qualified personnel involved in the installation, debugging, operation, and maintenance of the drive unit. This manual is written in Chinese.

Read online

ABB ACS800-17 specifications

Analogue input resolution0.025 % (12 bit)
Digital input logical thresholds< 8 VDC “0”, > 12 VDC “1”
Relay output switching capacity8 A at 24 VDC or 250 VAC
Rated apparent supply power260 kVA to 4728 kVA

Source: ABB ACA 635 IGBT Supply Sections 260 to 4728 kVA ACS 800-17 Line-side Converter 120 to 1385 kVA Manual

All ABB ACS800-17 documents by type

Service Manual 2

Disassembly, diagnostics and part numbers, for repair.

Questions answered in these manuals

Who is qualified to install and maintain the drive unit?

Only qualified electrical engineers can install and maintain the drive unit.

From: ABB ACS800-17 Quadrant Cabinet Drive Hardware Manual

How long must one wait after cutting power before maintenance?

One must wait at least 5 minutes to allow the intermediate DC circuit capacitors to discharge.

From: ABB ACS800-17 Quadrant Cabinet Drive Hardware Manual

Who is allowed to install and maintain the ACS800‑17 drive?

Only qualified electrical engineers may install and maintain the drive unit.

From: ABB ACS800-17 Hardware Manual

How can I verify that the drive is fully discharged before starting work?

After cutting power, wait at least five minutes, then measure the resistance between UDC+ and UDC‑ (L+ and L‑); it must be at least 1 MΩ to confirm discharge.

From: ABB ACS800-17 Hardware Manual

What safety precautions must be taken before working on the drive?

The drive must be isolated from the supply, the input power turned off, and a 5‑minute wait is required before starting work. Verify discharge by measuring voltage between UDC+ and UDC‑, and apply temporary grounding.

From: ABB ACS800-17 Hardware Manual

How should the drive be grounded?

The drive, motor, and adjoining equipment must be connected to a protective earth conductor sized according to safety regulations, with a minimum cross‑section of 10 mm² Cu or 16 mm² Al.

From: ABB ACS800-17 Hardware Manual