Axis 291 1U Video Server Rack Installation Guide

Axis 291 1U Video Server Rack Installation Guide

Installation Guide 51 pages · 3 MB · EN

The installation guide covers hardware installation of the AXIS 291 1U Video Server Rack, which can hold up to three Axis blade video servers. It includes a hardware inventory, power‑cord variants, mounting kit components, and safety cautions such as the risk of electric shock.

Placement requirements, power specifications, and connector details are described. The rack must be installed in an environment with 0‑45 °C temperature, 20‑80 % relative humidity, a power source within 1.8 m, and at least 5 cm of clearance on each side. Power is supplied directly from an AC cord (no on/off switch) and the unit powers up automatically when the cord is connected.

Read online

AXIS 291 1U specifications

Input voltage100‑240 V AC, 50‑60 Hz
Input current1.9 A
Maximum power consumption (3 servers)80 W
Ambient temperature range0 °C to +45 °C
Relative humidity range20 % to 80 %
Maximum weight of rack with cables6 kg

Source: Axis 291 1U Video Server Rack Installation Guide

All AXIS 291 1U documents by type

Installation Guide 3

Mounting, wiring and first power-up. Read it before the hardware goes in.

Questions answered in these manuals

How many blade video servers can be installed in the rack?

The rack can accommodate up to three Axis blade video servers.

From: Axis 291 1U Video Server Rack Installation Guide

How many Axis blade video servers can be installed in the rack?

The rack can accommodate up to three Axis blade video servers.

From: Axis 291 1U Video Server Rack Installation Guide

What type of power cord should be used?

Use the correct AC power cord for your country, and it must be earthed/grounded.

From: Axis 291 1U Video Server Rack Installation Guide

How many blade video servers can be installed in the AXIS 291 1U rack?

The rack can accommodate up to three Axis blade video servers.

From: Axis 291 1U Video Server Rack Installation Guide

Does the rack have an on/off switch?

No, the rack powers up as soon as the power cord is connected and powers down only when the cord is disconnected.

From: Axis 291 1U Video Server Rack Installation Guide