Axis 291 1U Video Server Rack Installation Guide

This document describes how to install Axis blade video servers in the AXIS 291 1U Video Server Rack.


Axis 291 1U Video Server Rack Installation Guide - cover page
Brand
AXIS
Category
SERVER
Document type
Installation Guide
Language
English
Pages
51
File format
PDF
File size
2.9 MB
Published
01 June, 2012
Updated
30 September, 2023
MD5 checksum
F178EA1C45D28406E2F6FE65F68628E7

About this manual

This guide explains how to install the Axis 291 1U Video Server Rack, which can hold up to three Axis blade video servers. It includes hardware inventory, rack‑mounting steps, power connection, and wiring details.

The document also lists environmental and safety requirements such as temperature range, humidity, clearance, grounding, and the need for an appropriate AC power cord for each region.

What's inside

  • About This Document
  • Hardware Inventory
  • Rack Overview
  • Placement Requirements
  • Installation in a 19" Equipment Rack
  • Power Connection
  • Power Specifications
  • Mounting Blade Video Servers
  • I/O Terminal Connector
  • DIP Switch Settings

Specifications

Input voltage100-240V AC, 50/60 Hz
Input current1.9 A
Maximum power consumption (3 × AXIS 2430)80 W
Ambient temperature range0 °C to +45 °C (32 °F to 113 °F)
Relative humidity range20 % to 80 %
Power source distanceWithin 1.8 m
Side clearanceMinimum 5 cm free space each side
Maximum rack weight6 kg

Frequently asked questions

How many blade video servers can be installed in the AXIS 291 1U rack?

The rack can accommodate up to three Axis blade video servers.

Does the rack have an on/off switch?

No, the rack powers up as soon as the power cord is connected and powers down only when the cord is disconnected.

Download PDF (2.9 MB)

More AXIS Manuals


View all AXIS manuals →