Axis 291 1U Video Server Rack Installation Guide

This document describes how to install Axis blade video servers in the AXIS 291 1U Video Server Rack.


Axis 291 1U Video Server Rack Installation Guide - cover page
Brand
AXIS
Category
Other device
Document type
Installation Guide
Language
English
Pages
51
File format
PDF
File size
3 MB
Published
01 June, 2012
Updated
28 September, 2023
MD5 checksum
0F66EDA7E38A4786A3B19DE016B65924

About this manual

The installation guide covers hardware installation of the AXIS 291 1U Video Server Rack, which can hold up to three Axis blade video servers. It includes a hardware inventory, power‑cord variants, mounting kit components, and safety cautions such as the risk of electric shock.

Placement requirements, power specifications, and connector details are described. The rack must be installed in an environment with 0‑45 °C temperature, 20‑80 % relative humidity, a power source within 1.8 m, and at least 5 cm of clearance on each side. Power is supplied directly from an AC cord (no on/off switch) and the unit powers up automatically when the cord is connected.

What's inside

  • About This Document
  • Hardware Inventory
  • AXIS Video Server Rack Overview
  • Placement Requirements
  • Installation in a 19" Equipment Rack
  • Connect Power
  • Power Specifications
  • AXIS Blade Video Servers
  • Mounting AXIS Blade Video Servers
  • 1/0 Terminal Connector

Specifications

Input voltage100‑240 V AC, 50‑60 Hz
Input current1.9 A
Maximum power consumption (3 servers)80 W
Ambient temperature range0 °C to +45 °C
Relative humidity range20 % to 80 %
Maximum weight of rack with cables6 kg

Frequently asked questions

How many blade video servers can be installed in the rack?

The rack can accommodate up to three Axis blade video servers.

Download PDF (3 MB)

More AXIS Manuals


View all AXIS manuals →