Rosemount CT5800 Continuous Gas Analyzer Reference Manual

Reference manual for the Rosemount CT5800 continuous gas analyzer covering safety notices, regulations and standards, installation, operation, and maintenance.


Rosemount CT5800 Continuous Gas Analyzer Reference Manual - cover page
Brand
Rosemount
Category
Analyzer
Document type
User Manual
Language
English
Pages
184
File format
PDF
File size
11.5 MB
Published
16 November, 2026
Updated
16 November, 2026
Model
CT5800
MD5 checksum
92F8F567EE80061DA35ADD644BCDAE76

About this manual

This is the Rosemount CT5800 Continuous Gas Analyzer Reference Manual, document 00809-0100-5800, Rev BC, April 2022, published by Emerson. It presents the safety information, user information, applicable regulations and standards, explosive/hazardous area protection, waste disposal, compliance approvals, and safety notices for installing, operating, and maintaining the analyzer, and it refers to the Rosemount CT5800 Quick Start Guide (00825-0100-5800) shipped with the instrument.

The manual lists the directives and standards the analyzer is designed to meet, including the Low Voltage, ATEX, EMC and WEEE directives and IEC 60079 series standards, and states compliance with USA 21 CFR 1040.10 and the requirements for applying CE and UKCA marking. It also explains the safety notice conventions and warns of hazards such as flammable substances, electric shock, and unvented or unlocked sample gas.

What's inside

  • Important information
  • User information
  • General safety notice/residual risk
  • Authorized personnel
  • Regulations and standards
  • Explosive / hazardous area protection
  • Waste disposal
  • Compliance approvals
  • Safety and information notices
  • Safety information

Specifications

Internal part temperature140 °F (60 °C)
Power sourceMains voltage
Explosion protection categoryCategory 3 instruments
EMC directive2014/30/EU
Quality management systemISO 9001: 2015
Laser product complianceUSA 21 CFR 1040.10
Sample gas purge timeFive minutes

Frequently asked questions

What must be done before opening the front cover of the analyzer?

The circuit breakers must be set to OFF and tagged off before the front cover is opened.

Which additional manual is referenced for the CT5800?

The Rosemount CT5800 Quick Start Guide, document 00825-0100-5800.

Which markings has the Rosemount CT5800 satisfied the requirements for?

It has satisfied the requirements for applying the CE and UKCA marking.

How long should the analyzer and the sample gas return system run after shutdown?

They should run for five minutes so any sample gas in the system is returned to the exhaust.

Download PDF (11.5 MB)

More Rosemount Manuals


View all Rosemount manuals →