Rosemount 485 Annubar Pak-Lok Installation Guide

Quick installation guide for Rosemount 485 Annubar Pak-Lok components, covering steps, diagrams, and safety notes for flow measurement systems.


Rosemount 485 Annubar Pak-Lok Installation Guide - cover page
Brand
Rosemount
Category
Industrial Robot
Document type
Quick Start Guide
Language
Chinese
Pages
20
File format
PDF
File size
7 MB
Published
21 November, 2026
Updated
21 November, 2026
Model
485
MD5 checksum
072CDF68E181FC6CDBA1FA1701D608A4

About this manual

This guide provides step-by-step instructions for installing the Rosemount 485 Annubar Pak-Lok component in flow measurement systems. It includes details on installation location, drilling, welding, inserting the Annubar, and mounting the transmitter. Safety warnings and component specifications are included. For configuration or maintenance, refer to the full reference manual. This manual is written in Chinese.

What's inside

  • Installation Steps
  • Component Breakdown Diagram
  • Drilling and Welding
  • Transmitter Installation
  • Safety Warnings
  • Straight Pipe Requirements
  • Alignment and Orientation
  • Valve Groups and Pressure Tubing

Frequently asked questions

What is the maximum allowable misalignment during installation?

Maximum allowable misalignment is 3°.

What is the maximum misalignment allowed during installation of the 485 Annubar?

The 485 Annubar allows a maximum of 3° misalignment during installation.

What hole diameter is required for sensor size 1?

Sensor size 1 requires a hole diameter of 19 毫米 (3/4 英寸 ).

What temperature limit applies to the transmitter diaphragm?

The transmitter diaphragm will be damaged if its temperature exceeds 121°C (250°F).

Download PDF (7 MB)

More Rosemount Manuals


View all Rosemount manuals →