Service manual for the Pentair FLECK 2850 Control Valve covering installation, timer settings, regeneration cycles, and troubleshooting.
This document serves as a service manual for the Pentair FLECK 2850 Control Valve, providing detailed instructions for installation, start-up, and timer setting procedures. It covers various timer models including the 3200, 3210, 3220, and 3230, along with specific assembly instructions for different powerhead and brine system configurations.
The manual includes comprehensive job specification sheets, installation guidelines regarding water pressure and electrical facilities, and step-by-step start-up instructions. It also details troubleshooting procedures, flow diagrams, and wiring information for multiple system types.
| Minimum Water Pressure | 20 pounds (1.4 bar) |
|---|---|
| Maximum Water Pressure | 125 psi (8.6 bar) |
| Maximum Water Temperature | 110°F (43°C) |
| Residential Drain Line Size | 1/2-inch (13 mm) |
| Commercial Drain Line Size | Same as drain line flow control |
A minimum of 20 pounds (1.4 bar) of water pressure is required for regeneration valve to operate effectively.
Plumber tape is the only sealant to be used on the drain fitting.
Do not use granulated or rock salt.