IronRidge FRA-01 Flat Roof Attachment Installation Guide

IronRidge FRA-01 Flat Roof Attachment installation guide with parts list, tools, sealing requirements, torque value and structural certification details.


IronRidge FRA-01 Flat Roof Attachment Installation Guide - cover page
Brand
IRONRIDGE
Category
Other
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
2.9 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
21F6F424CC18725357EAE2285C98C024

About this manual

This two-page document covers the IronRidge Flat Roof Attachment, model FRA-01. Page one is a drawing with the parts list: the flat roof attachment base, the flat roof attachment membrane, a flat 3/8" x 1.25" OD stainless steel washer and a 3/8-16 x 1.125" hex stainless steel bolt. The attachment weighs 1.2 lbs and the document number is FRA-01-MAN REV 1.0.

Page two gives the installation steps: marking attachment locations, installing roof screws, attaching the rail mounting bracket with washers and 3/8" hardware torqued to 250 in-lbs (21 ft-lbs), and sealing the attachment and membrane per the roofing manufacturer's requirements. It also lists required tools, notes that the type, size and quantity of roof screws are specified by the Structural Engineer, and states the structural certification for the International Building Code, ASCE/SEI-7 and UL 2703.

What's inside

  • Parts List
  • Required Tools
  • Membrane Flashing
  • Marking Attachment Locations
  • Rail Mounting Bracket Installation
  • Sealing Requirements
  • Structural Certification

Specifications

Weight1.2 lbs
Bolt3/8-16 x 1.125" hex, stainless steel
WasherFlat 3/8" x 1.25" OD, stainless steel
Rail mounting bracket torque250 in-lbs (21 ft-lbs)
Maximum roof screw fastener size#15
Structural certificationInternational Building Code & ASCE/SEI-7
UL standardUL 2703 mechanical and bonding requirements

Frequently asked questions

What torque is required for the rail mounting bracket hardware?

Attach the rail mounting bracket with washers and 3/8" hardware torqued to 250 in-lbs (21 ft-lbs).

What tools are required for the installation?

A tape measure, chalk, approved sealing materials, roof screws, and a driver with a 9/16" hex socket.

What should be done in freeze/thaw locations?

A roof manufacturer's approved sealant should be applied around the 3/8" bolt and in the bracket's slot before tightening the bolt.

Who specifies the roof screws?

The type, size and quantity of roof screws are specified by the Structural Engineer, and the fastener size must not exceed #15.

Download PDF (2.9 MB)

More IRONRIDGE Manuals


View all IRONRIDGE manuals →