This document describes the installation procedures for solar panels.
This manual describes installation procedures for the IronRidge ground mount system used with flat-plate photovoltaic modules. It covers building the base, connecting the substructure, placing rails, securing grounding lugs, and securing modules.
It also lists system ratings, markings, a pre-installation checklist, required tools, torque values, pipe and tubing specifications, and grounding requirements.
| Max OCPD rating | 40A |
|---|---|
| Max module size | 30.5 ft² |
| Module orientation | Portrait or Landscape |
| System design load rating | 10 PSF downward, 5 PSF upward, 5 PSF lateral |
| CAMO specific design load rating | 50 PSF downward, 50 PSF upward, 15 PSF lateral |
| CSA load rating | 2400 PA [50 PSF] |
| Max framed module size | 25.6 ft² |
| Max frameless module size | 21.5 ft² |
| Fire rating | Not Fire Rated |
| Structural certification | International Building Code & ASCE/SEI-7 |
| Approved base pipe | 2 in or 3 in NPS Schedule 40 Grade B pipe |
| Rail connector U-bolt nut torque | 60 in-lbs |
Only one grounding lug, either rail or module, is required per continuous subarray, regardless of subarray size, unless frameless modules are used.
A minimum 10 AWG solid copper or stranded grounding wire is required.
Rail connector U-bolt nuts are torqued to 60 in-lbs.
At least 22 inches of pipe must be inserted into the ground screw.