IronRidge Ground Mount Solar Panel Installation Manual

This document describes the installation procedures for solar panels.


IronRidge Ground Mount Solar Panel Installation Manual - cover page
Brand
IRONRIDGE
Category
Other products
Document type
Installation Guide
Language
English
Pages
20
File format
PDF
File size
1.4 MB
Published
16 November, 2023
Updated
16 November, 2023
MD5 checksum
2C8A5DE586C97F813F483FAAEAFE9376

About this manual

This manual describes installation procedures for the IronRidge ground mount system used with flat-plate photovoltaic modules. It covers building the base, connecting the substructure, placing rails, securing grounding lugs, and securing modules.

It also lists system ratings, markings, a pre-installation checklist, required tools, torque values, pipe and tubing specifications, and grounding requirements.

What's inside

  • Ratings
  • Markings
  • Checklist
  • 1. Build Base
  • 2. Connect Substructure
  • 3. Place Rails
  • 4. Secure Lugs
  • 5. Secure Modules
  • CAMO
  • Electrical Diagram

Specifications

Max OCPD rating40A
Max module size30.5 ft²
Module orientationPortrait or Landscape
System design load rating10 PSF downward, 5 PSF upward, 5 PSF lateral
CAMO specific design load rating50 PSF downward, 50 PSF upward, 15 PSF lateral
CSA load rating2400 PA [50 PSF]
Max framed module size25.6 ft²
Max frameless module size21.5 ft²
Fire ratingNot Fire Rated
Structural certificationInternational Building Code & ASCE/SEI-7
Approved base pipe2 in or 3 in NPS Schedule 40 Grade B pipe
Rail connector U-bolt nut torque60 in-lbs

Frequently asked questions

How many grounding lugs are required for a continuous subarray?

Only one grounding lug, either rail or module, is required per continuous subarray, regardless of subarray size, unless frameless modules are used.

What size grounding wire is required for the grounding lugs?

A minimum 10 AWG solid copper or stranded grounding wire is required.

What torque is specified for rail connector U-bolt nuts?

Rail connector U-bolt nuts are torqued to 60 in-lbs.

How far must pipe be inserted into a ground screw?

At least 22 inches of pipe must be inserted into the ground screw.

Download PDF (1.4 MB)

More IRONRIDGE Manuals


View all IRONRIDGE manuals →