IronRidge Ground Mount Installation Manual

Installation manual for the IronRidge Ground Mount solar mounting system, covering base construction, rail placement, module securing, grounding, and…


IronRidge Ground Mount Installation Manual - cover page
Brand
IRONRIDGE
Category
Industrial Supply
Document type
Installation Guide
Language
English
Pages
14
File format
PDF
File size
1.3 MB
Published
11 November, 2026
Updated
11 November, 2026
MD5 checksum
1B4D41432987A870D863BDAD96CFE40B

About this manual

This manual provides installation procedures and standards for the IronRidge Ground Mount system. It covers building the base, connecting the substructure, placing rails, securing grounding lugs, and securing modules.

It also includes an electrical diagram, optional diagonal braces, end caps, wire clips, splicing, cross pipe details, microinverter kits, frameless module kits, and module compatibility information.

What's inside

  • Build Base
  • Connect Substructure
  • Place Rails
  • Secure Lugs
  • Secure Modules
  • Electrical Diagram
  • Diagonal Braces (Optional)
  • End Caps
  • Wire Clips
  • Module Compatibility

Specifications

U-bolt torque15 ft-lbs
Rail connector U-bolt nut torque60 in-lbs
Rail connector bracket torque21 ft-lbs
Grounding lug terminal screw torque20 in-lbs
Module clamp (UFO) torque80 in-lbs
Diagonal brace bolt torque40 ft-lbs
Diagonal brace set screw torque15 ft-lbs

Frequently asked questions

What torque is required for the rail connector U-bolt nuts?

Torque the U-bolt nuts to 60 in-lbs and the bracket to 21 ft-lbs.

What is the torque for securing modules with UFO clamps?

Torque the UFO clamps to 80 in-lbs.

Download PDF (1.3 MB)

More IRONRIDGE Manuals


View all IRONRIDGE manuals →