New York State Psychiatric Institute Magnetic Resonance Imaging Unit Safety Manual

This document is a safety manual for the Magnetic Resonance Imaging Unit at the New York State Psychiatric Institute. It outlines the safety procedures and precautions to be taken when working in the unit.


New York State Psychiatric Institute Magnetic Resonance Imaging Unit Safety Manual - cover page
Category
Professional medical equipment
Document type
Other
Language
English
Pages
20
File format
PDF
File size
603 KB
Published
16 November, 2023
Updated
16 November, 2023
MD5 checksum
CB55B14D1A55D29735D13FF8E25AC9E7

About this manual

This is the safety manual for the magnetic resonance imaging unit of the New York State Psychiatric Institute. It lists the safety personnel and their contact details, includes a diagram of the MRI suite, and summarizes what staff should do in medical, psychiatric, fire, liquid helium, quench, emergency-off and power-failure situations.

The manual then describes the safety organization within the MRI unit — the MRI Protocol Committee, the MRI Safety Committee, the safety manager and the operators of the MRI scanner — and sets out general safety considerations and specific hazards, including electrical, cryogen and fire hazards, infection control procedures for human studies, safety procedures for experiments involving animals, and incident reports.

What's inside

  • Contact Information for Safety Personnel in the MRI Unit
  • Diagram of the MRI Suite
  • Summary of Emergency Procedures for the MRI Unit
  • Safety Organization within the MRI Unit
  • General Safety Considerations
  • Specific Hazards within the MRI Unit
  • Infection Control Procedures for Human Studies
  • Safety Procedures for MRI Experiments Involving Animals
  • Incident Reports

Specifications

Magnetic field strength3T
Liquid helium temperature-269 degrees Celsius (-452.2 degrees Fahrenheit)
Helium system pressure after fillingapproximately 1200 Torr
Normal helium pressure dropapproximately 2 Torr per day
Pressure at which the system becomes unstablebelow 600 Torr
Helium refill interval under ideal circumstancesevery 300 days
Battery back-up (UPS) duration during power failureup to two hours
Emergency magnet rundown timeabout two minutes

Frequently asked questions

What does the Emergency Off button do?

It removes all electrical power from the MRI console and the patient table, including power from the UPS devices, turning off the entire MR system except the static magnetic field and the magnet rundown unit. It does not produce a quench.

Does the emergency magnet rundown produce a quench?

Yes. Unlike the Emergency Off button, the rundown allows rapid reduction of the magnetic field in about two minutes and will boil off cryogens, producing a quench.

How long does the battery back-up last during a power failure?

In the event of a power failure, the unit's battery back-up (UPS) system lasts for up to two hours to permit an orderly shutdown of the MRI scanner console.

How often does the liquid helium system need refilling?

Under ideal circumstances the system only requires refilling by GE every 300 days.