This document is a safety manual for the Magnetic Resonance Imaging Unit at the New York State Psychiatric Institute. It outlines the safety procedures and precautions to be taken when working in the unit.
This is the safety manual for the magnetic resonance imaging unit of the New York State Psychiatric Institute. It lists the safety personnel and their contact details, includes a diagram of the MRI suite, and summarizes what staff should do in medical, psychiatric, fire, liquid helium, quench, emergency-off and power-failure situations.
The manual then describes the safety organization within the MRI unit — the MRI Protocol Committee, the MRI Safety Committee, the safety manager and the operators of the MRI scanner — and sets out general safety considerations and specific hazards, including electrical, cryogen and fire hazards, infection control procedures for human studies, safety procedures for experiments involving animals, and incident reports.
| Magnetic field strength | 3T |
|---|---|
| Liquid helium temperature | -269 degrees Celsius (-452.2 degrees Fahrenheit) |
| Helium system pressure after filling | approximately 1200 Torr |
| Normal helium pressure drop | approximately 2 Torr per day |
| Pressure at which the system becomes unstable | below 600 Torr |
| Helium refill interval under ideal circumstances | every 300 days |
| Battery back-up (UPS) duration during power failure | up to two hours |
| Emergency magnet rundown time | about two minutes |
It removes all electrical power from the MRI console and the patient table, including power from the UPS devices, turning off the entire MR system except the static magnetic field and the magnet rundown unit. It does not produce a quench.
Yes. Unlike the Emergency Off button, the rundown allows rapid reduction of the magnetic field in about two minutes and will boil off cryogens, producing a quench.
In the event of a power failure, the unit's battery back-up (UPS) system lasts for up to two hours to permit an orderly shutdown of the MRI scanner console.
Under ideal circumstances the system only requires refilling by GE every 300 days.