ABB ACS580/ACS550 General Purpose Drives Replacement Guide

The ABB ACS580 general purpose drive replaces the ACS550 drive. This guide describes how to replace the ACS550 drive with the ACS580 drive.


ABB ACS580/ACS550 General Purpose Drives Replacement Guide - cover page
Brand
ABB
Category
inverter
Document type
Installation Guide
Language
English
Pages
24
File format
PDF
File size
810 KB
Published
11 November, 2023
Updated
11 November, 2023
Models
ACS580, ACS550
MD5 checksum
6A260BF4528B664BD76E2A52700EC9EF

About this manual

This ABB replacement guide explains how to replace an ACS550 general purpose drive with an ACS580 drive. It covers selection and sizing, type designation, options, power and current ranges, dimensions, mounting, free space requirements, electrical data, parameter groups and commissioning after replacement.

The guide is intended for limited distribution to ABB technical partners and customers. It states that all installation and electrical work should be carried out by a trained professional and that specifications are subject to change without notice.

What's inside

  • Selection and sizing of the drive
  • Type designation
  • Options
  • Power and current range
  • Dimensions
  • Mounting
  • Free space requirements
  • Electrical data
  • Parameter groups
  • Commissioning ACS580 after ACS550 replacement

Specifications

Typical motor power base voltage400 V
ACS580 rated current INContinuous current without overloadability at 40 °C; frames R0 to R3 up to +50 °C
ACS580 rating temperature for frames R0 to R3Up to +50 °C
ACS580 rating temperature for frames R4 to R9Up to +40 °C in enclosed IP class 21

Frequently asked questions

What drive replaces the ACS550?

The guide describes replacing the ACS550 drive with the ACS580 general purpose drive.

How do I select the correct ACS580 replacement for an ACS550?

Start by identifying the ACS550 type designation, then compare the motor power and current rating and the options.

How is ACS580 IN rated?

The guide states that ACS580 IN is without overloadability.

What commissioning step does the guide include after replacement?

It includes commissioning the ACS580 after ACS550 replacement.

Download PDF (810 KB)

More ABB Manuals


View all ABB manuals →