ABB WavePro-D Data Center Busway Installation and Maintenance Manual

The ABB WavePro-D Data Center Busway Installation and Maintenance Manual provides safety guidelines, installation steps, commissioning, and troubleshooting…


ABB WavePro-D Data Center Busway Installation and Maintenance Manual - cover page
Brand
ABB
Document type
Installation Guide
Language
Chinese
Pages
24
File format
PDF
File size
6.3 MB
Published
29 September, 2026
Updated
29 September, 2026
MD5 checksum
1CF29984450F1A56DEE6863F5ED91012

About this manual

This manual covers the WavePro‑D busway system used in data‑center power distribution. It explains the product’s features, applicable standards and the documentation’s purpose for installers and maintenance personnel.

Key sections include storage and handling precautions, pre‑installation preparation, detailed installation procedures, torque specifications, insulation resistance testing, commissioning, safety notes, and a troubleshooting guide for common faults. This manual is written in Chinese.

What's inside

  • Storage Precautions
  • Handling and Unloading Precautions
  • Pre‑Installation Preparation
  • Busway Installation
  • Busway Commissioning, Operation and Maintenance
  • Safety Precautions
  • Common Faults and Troubleshooting
  • Appendices

Frequently asked questions

What insulation resistance must be measured after connecting each busway section?

The measured insulation resistance must be at least 20 MΩ; if it is below 0.4 MΩ or shows a large deviation, the cause must be identified and corrected before proceeding.

What torque is required for tightening the connector bolts?

Connector bolts must be tightened to a torque of 35 ± 5 Nm.

Which tools are required for the installation of the WavePro‑D busway?

Required tools include a tape measure, megohmmeter, torque wrench with socket, and hex key, among others.

Download PDF (6.3 MB)

More ABB Manuals


View all ABB manuals →