Panasonic PT-D5600U/PT-D5600UL/PT-DW5000U/PT-DW5000UL Manual(1)

This document is about how to install KLR/KDR Reactors. It introduces the features and characteristics of these Reactors, and provides usage recommendations and precautions.


Panasonic PT-D5600U/PT-D5600UL/PT-DW5000U/PT-DW5000UL Manual(1) - cover page
Brand
Panasonic
Category
Board
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
85 KB
Published
07 August, 2012
Updated
30 September, 2023
MD5 checksum
5DD8A14F85B6972E243D07C18AE49E46

About this manual

This document provides installation instructions and safety warnings for TCI KLR and KDR line reactors. It covers general safety precautions, such as disconnecting power before working on equipment and ensuring proper grounding. It also details specific recommendations for installing these reactors on the input side of a Variable Frequency Drive (VFD).

What's inside

  • Warnings and Cautions
  • General Safety Instructions
  • Recommendations and Considerations
  • Reactor Installation
  • Field Wiring Information
  • Wiring Diagram
  • Product Specifications

Specifications

Voltage Class600 Volt Class
Phase Type3-Phase
Ambient Temperature40° C
Current Rating200% rated current for 3 minutes
CertificationsUL Recognized, CE Marked, CSA Approved

Frequently asked questions

What is the recommended impedance for TCI reactors on the VFD output?

TCI recommends 1.5% impedance reactors to be used on the output of the VFD.

How close should the reactor be mounted to the VFD?

Reactors should be mounted as close to the output terminals of the VFD as possible.

What is the recommended clearance for the reactor enclosure?

A clearance of 3 inches on all sides of the reactors and its enclosure is recommended.

Download PDF (85 KB)

More Panasonic Manuals


View all Panasonic manuals →