ABB ICOS GLA351 Enhanced Performance QC Rackmount Analyzers User Manual

The ICOS GLA351 Enhanced Performance QC Rackmount Analyzer from Emerson Process Management is a high-performance analyzer suitable for a wide range of industrial applications. It features:


ABB ICOS GLA351 Enhanced Performance QC Rackmount Analyzers User Manual - cover page
Brand
ABB
Category
Analyzers
Document type
User Manual
Language
English
Pages
128
File format
PDF
File size
6.1 MB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
3B9CA53FC9A0D1AE112287355ED9EFEE

About this manual

This user manual covers ABB ICOS GLA351 Enhanced Performance QC Rackmount Analyzers, including safety information, laser equipment classification, certifications, labels, and operator precautions. It also describes transportation, storage, positioning, mounting, setup, initialization, operation, maintenance, and appendices.

The manual includes sections on power, data interface, and plumbing connections; rack-mount installation; file transfer and setup menus; daily operation and maintenance; and optional accessories such as the multi-port inlet unit and external dynamic dilution system.

What's inside

  • Safety
  • Analyzer Overview
  • Performance Specifications
  • Mount the Analyzer
  • Analyzer Setup
  • Initialize and Run the Analyzer
  • Maintenance
  • Appendices

Specifications

External dimensions19.5”H x 19”W x 34”D
Weight68 kg
Storage temperature-20 to +60 °C
Component operating voltage≤ 6.8 V DC
Laser class (normal operation)Class 1
Laser class (exposed)Class IIIb
EMC certification2004/108/EU (EMC), EN61326-1
Laser regulation21 CFR 1040.10 and 1040.11
WEEE statusNot subject to WEEE Directive 2002/96/EC

Frequently asked questions

What laser class is the analyzer during normal operation?

It is a Class 1 laser instrument when the case cover is closed and locked into position.

What laser class applies when the laser is exposed?

The laser is classified as Class IIIb when exposed.

How much free space is needed around the analyzer for ventilation?

Leave four inches of free space on each side of the analyzer.

How many people are needed to position the analyzer?

Positioning the analyzer is a two-person task.

Download PDF (6.1 MB)

More ABB Manuals


View all ABB manuals →