This manual describes the installation and maintenance of KTM OM-2 split-body floating ball valves, including packaging, transportation, storage, preparation before installation and installation.
This Chinese-language manual from Emerson covers the KTM OM-2 split-body floating ball valve, from storage and shipping through installation, startup checks, operation and repair. The opening sections describe how to prepare and keep the valve in storage, how to crate, lift and handle packed and unpacked valves, and the checks to make before installation, including removing the flange seal discs, cleaning the bore and confirming the material on the nameplate suits the service.
The later sections give installation notes (mounting position, valve open during installation, insulation of the actuator above 200 °C), checks before startup, operating instructions with open/close indication and the optional locking device, and maintenance procedures for the packing, body seal, disassembly and reassembly. Bolt tightening torque tables and assembled-valve torque tables are provided for pressure classes 150 and 300, together with an illustrated parts material list. This manual is written in Chinese.
| Pressure ratings | 150 and 300 |
|---|---|
| Packing materials | RTFE or graphite (PTFE or graphite) |
| Stem design | Anti-blowout; the stem cannot be removed through the top of the body |
| Stem assembly size range (EB21 / EB22) | 50 mm to 250 mm |
| Rated padlock diameter for locking device | 25 mm |
It should be kept in a clean, dry warehouse, in the open position, with the ends protected by suitable seal discs.
If a long storage period is needed, the desiccant bag in the crate should be replaced every four months.
No. The stem has an anti-blowout design, so it must be removed from inside the body.
Insulation is recommended to protect the actuator and accessories when the working temperature exceeds 200 °C (392 °F).