Emerson KTM OM-2 Split-Body Floating Ball Valve Installation and Maintenance Manual

This manual describes the installation and maintenance of KTM OM-2 split-body floating ball valves, including packaging, transportation, storage, preparation before installation and installation.


Emerson KTM OM-2 Split-Body Floating Ball Valve Installation and Maintenance Manual - cover page
Brand
Emerson
Category
Other
Document type
Service Manual
Language
Chinese
Pages
8
File format
PDF
File size
1.2 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
17FE1ED35CA44FD9F45B3A7CA09E30C2

About this manual

This Chinese-language manual from Emerson covers the KTM OM-2 split-body floating ball valve, from storage and shipping through installation, startup checks, operation and repair. The opening sections describe how to prepare and keep the valve in storage, how to crate, lift and handle packed and unpacked valves, and the checks to make before installation, including removing the flange seal discs, cleaning the bore and confirming the material on the nameplate suits the service.

The later sections give installation notes (mounting position, valve open during installation, insulation of the actuator above 200 °C), checks before startup, operating instructions with open/close indication and the optional locking device, and maintenance procedures for the packing, body seal, disassembly and reassembly. Bolt tightening torque tables and assembled-valve torque tables are provided for pressure classes 150 and 300, together with an illustrated parts material list. This manual is written in Chinese.

What's inside

  • Storage preparation and protection
  • Shipping requirements
  • Storage before installation
  • Preparation before installation
  • Installation instructions
  • Checks before valve startup
  • Operating instructions and locking device
  • Packing and body seal maintenance
  • Valve disassembly and reassembly
  • Bolt tightening torque and parts material list

Specifications

Pressure ratings150 and 300
Packing materialsRTFE or graphite (PTFE or graphite)
Stem designAnti-blowout; the stem cannot be removed through the top of the body
Stem assembly size range (EB21 / EB22)50 mm to 250 mm
Rated padlock diameter for locking device25 mm

Frequently asked questions

How should the ball valve be stored before installation?

It should be kept in a clean, dry warehouse, in the open position, with the ends protected by suitable seal discs.

How often should the desiccant bag be replaced during long storage?

If a long storage period is needed, the desiccant bag in the crate should be replaced every four months.

Can the stem be taken out through the top of the valve body?

No. The stem has an anti-blowout design, so it must be removed from inside the body.

When is insulation recommended for the actuator?

Insulation is recommended to protect the actuator and accessories when the working temperature exceeds 200 °C (392 °F).

Download PDF (1.2 MB)

More Emerson Manuals


View all Emerson manuals →