Emerson Anderson Greenwood Valve Installation Operation and Maintenance Instructions

This document is the instruction manual for Anderson Greenwood valves, which introduces how to install, operate and maintain valves


Emerson Anderson Greenwood Valve Installation Operation and Maintenance Instructions - cover page
Brand
Emerson
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
2
File format
PDF
File size
154 KB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
44A67166D2B430F0A90892964D6131B9

About this manual

This document serves as the Installation, Operation, and Maintenance Instructions for Anderson Greenwood instrumentation products, including hand valves, gauge valves, manifolds, and ball valves with bore sizes of 25mm (1") or less. It outlines safety precautions, installation procedures for various connection types, and specific operational guidelines for multi-turn rising stem and ball valves.

What's inside

  • Foreword
  • Spare parts
  • Storage
  • Protection
  • Selection
  • Installation
  • Cleaning and Fitting
  • Multi-Turn-Rising Stem Valves
  • Ball Valves
  • Maintenance

Specifications

Product CoverageHand Valves, gauge valves, manifolds and accessories with multi-turn-rising stem; Ball valve products with bore sizes of 25mm (1") or less
Stem Thread DirectionRight hand thread
Operating DirectionCounter-clockwise to open and clockwise to close

Frequently asked questions

How should Anderson Greenwood valves be stored?

They should be stored in the original delivery crates with any waterproof lining and/or desiccant remaining in place, off the ground in a clean, dry, indoor area.

How should flange bolts be tightened?

Bolts should be tightened in a diagonal pattern.

Download PDF (154 KB)

More Emerson Manuals


View all Emerson manuals →