Agilent Installation of the 2 position/10 port valve into the 1100 series thermostatted column compartment Manual

This file describes the installation of the 2 PS/10 PT column switching valve into the Agilent 1100 Series thermostatted column compartment (G1316A TCC).


Agilent Installation of the 2 position/10 port valve into the 1100 series thermostatted column compartment Manual - cover page
Brand
Agilent
Document type
Installation Guide
Language
English
Pages
12
File format
PDF
File size
456 KB
Published
08 June, 2012
Updated
01 October, 2023
MD5 checksum
A4B1939332C2B71D02D10856502BF281

About this manual

This document provides instructions for installing the 2 position/10 port valve (part number G1316-68709) into an Agilent 1100 Series Thermostatted Column Compartment (G1316A). The upgrade allows for alternating column regeneration, which increases sample throughput by flushing and equilibrating a second column while the first is in use. Installation requires specific firmware revisions for the G1316A TCC control module and the G1323B control module.

What's inside

  • System Requirements
  • Performance Specifications
  • Delivery Checklist
  • Theory Of Alternating Column Regeneration
  • Installation Steps
  • Firmware Update
  • Capillary Kit

Frequently asked questions

What is the purpose of installing this valve upgrade?

The installation allows for alternating column regeneration to increase sample throughput and efficiency.

Which Agilent system models are compatible with this upgrade kit?

This upgrade can be installed in any Agilent 1100 Series thermostatted column compartments.

What tools are required for the installation procedure?

A Pozi-driv #2 screwdriver is needed to perform the installation steps.

Download PDF (456 KB)

More Agilent Manuals


View all Agilent manuals →