This manual is a site preparation guide for Agilent 700 Series ICP optical emission spectrometers. It mainly introduces the contents and methods of site preparation work.
The document serves as a comprehensive Site Preparation Guide for the Agilent 700 Series ICP Optical Emission Spectrometers. It outlines critical pre-installation steps including site compliance with safety regulations, environmental conditions such as temperature and cleanliness, and specific requirements for electrical power, gas supplies (argon and nitrogen), and water cooling systems.
The guide also covers unpacking procedures, instrument weights and dimensions, and the setup of auxiliary accessories like the SPS Sample Preparation System and SVS 1 Switching Valve System. It includes a checklist to ensure all site requirements are met before requesting installation.
| Laboratory temperature range | 20 to 25 °C (68 and 77 °F) |
|---|---|
| Entrance width requirement | at least 2200 cm (86.6 in) wide |
| VGA gas supply permissible pressure range | 300-400 kPa (42-57 psi) |
| VGA gas supply recommended pressure | 325 kPa (46 psi) |
The PC must have Microsoft® Windows® XP SP3 or Windows 7 Professional 64-bit installed.
The laboratory temperature must be maintained between 20 and 25 °C (68 and 77 °F).
The entrance to the lab must be at least 2200 cm (86.6 in) wide.
The permissible pressure range is 300-400 kPa (42-57 psi) with required flow rates up to 100 mL/min.