Key facts
- Brand
- Cognex
- Model
- VC5
- Documents
- 2
- Languages
- ZH · EN
- Last added
- 2023-10-17
Start here

Cognex VC5 Vision Controller Installation Guide
This guide provides step-by-step instructions for installing the Cognex VC5 vision controller, including power requirements, wiring connections, and safety precautions. It also covers regulatory compliance and maintenance procedures. The document includes detailed diagrams and specifications for all ports and terminals. This manual is written in Chinese.
Read onlineCognex VC5 specifications
| Power Supply | 24VDC, 5A |
|---|---|
| Fuse Type | Littelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse |
| Max Torque for I/O Terminals | 0.25Nm (2.2in-lb) |
| Max Torque for 24VDC Power Connector | 0.6Nm (5.3in-lb) |
All Cognex VC5 documents by type
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in these manuals
What power supply is required for the VC5 vision controller?
The VC5 requires a 24VDC, 5A NRTL-certified power supply.
What type of fuse should be used to replace the fuse in the VC5?
Use a Littelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse rated 5A, 250V.
What power supply is required for the VC5 Vision Controller?
The vision controller must be supplied by a NRTL-listed power supply with a minimum output rated 24VDC, 5A.
What type of fuse should be used to replace the system fuse?
The replacement fuse must be a Littelfuse® (Part 0217005) or an equivalent UL-recognized fast-blow fuse rated at 5A, low breaking capacity, and 250V.
