This document describes how to install the vision controller, including installation steps and precautions.
This guide provides step-by-step instructions for installing the Cognex VC5 vision controller, including power requirements, wiring connections, and safety precautions. It also covers regulatory compliance and maintenance procedures. The document includes detailed diagrams and specifications for all ports and terminals. This manual is written in Chinese.
| Power Supply | 24VDC, 5A |
|---|---|
| Fuse Type | Littelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse |
| Max Torque for I/O Terminals | 0.25Nm (2.2in-lb) |
| Max Torque for 24VDC Power Connector | 0.6Nm (5.3in-lb) |
The VC5 requires a 24VDC, 5A NRTL-certified power supply.
Use a Littelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse rated 5A, 250V.
The maximum torque for I/O terminals is 0.25Nm (2.2in-lb).