Cognex VC5 Vision Controller Installation Guide

This document describes how to install the vision controller, including installation steps and precautions.


Cognex VC5 Vision Controller Installation Guide - cover page
Brand
Cognex
Document type
Installation Guide
Language
Chinese
Pages
56
File format
PDF
File size
3.7 MB
Published
17 October, 2023
Updated
17 October, 2023
Model
VC5
MD5 checksum
0C0AA188A51356B00F02B16F1A609A27

About this manual

This guide provides step-by-step instructions for installing the Cognex VC5 vision controller, including power requirements, wiring connections, and safety precautions. It also covers regulatory compliance and maintenance procedures. The document includes detailed diagrams and specifications for all ports and terminals. This manual is written in Chinese.

What's inside

  • Legal Notice
  • Symbols
  • Regulatory Compliance
  • Installation Notes
  • Contents Introduction
  • Installation
  • Connecting Cognex GigE Camera
  • Connecting Cognex DS1000 Sensors
  • Connecting I/O Terminals
  • Connecting Encoder Terminals

Specifications

Power Supply24VDC, 5A
Fuse TypeLittelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse
Max Torque for I/O Terminals0.25Nm (2.2in-lb)
Max Torque for 24VDC Power Connector0.6Nm (5.3in-lb)

Frequently asked questions

What power supply is required for the VC5 vision controller?

The VC5 requires a 24VDC, 5A NRTL-certified power supply.

What type of fuse should be used to replace the fuse in the VC5?

Use a Littelfuse® (Part 0217005) or equivalent UL-certified fast-blow fuse rated 5A, 250V.

What is the maximum torque for connecting I/O terminals?

The maximum torque for I/O terminals is 0.25Nm (2.2in-lb).

Download PDF (3.7 MB)

More Cognex Manuals


View all Cognex manuals →