This manual provides installation instructions for the NORAC UC4 automated sprayer boom height control system, covering electrical and hydraulic setups.
The document serves as a generic unit installation guide for the NORAC UC4 Total Control Automatic Boom Height System. It details two primary installation styles: Electrically Teed Installation (preferred) and Hydraulically Teed Installation, explaining how to determine which is required based on the sprayer's existing valve block wiring.
It must be done if the sprayer valve block does NOT have individual electrical wiring to control each boom function.
If any boom movement is triggered, the whole NORAC system will convert to MANUAL mode.