Enphase IQ Gateway CT-100-SPLIT-ROW Current Transformer Installation Instructions

Installation instructions for the Enphase CT-100-SPLIT-ROW 100A split-core current transformers used for production and consumption monitoring.


Enphase IQ Gateway CT-100-SPLIT-ROW Current Transformer Installation Instructions - cover page
Brand
Enphase
Category
Current Monitor
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
241 KB
Published
09 November, 2026
Updated
09 November, 2026
MD5 checksum
158CFBD87B4E2B7365A1F3E3F524A617

About this manual

The Enphase CT-100-SPLIT-ROW installation instruction describes how to install a set of three 100A split-core current transformers for production and consumption monitoring with the Enphase IQ Gateway. It explains preparation, wiring and clamping for production CTs on Lines 1, 2 and 3, and installation of consumption CTs on the main supply lines.

The document also gives safety warnings and notes, product specifications, and installation tips for running multiple conductors through one CT and for parallel-connected CTs in 200A services or crowded service panels.

What's inside

  • Preparation
  • Installing the CTs for production monitoring
  • Install the consumption CTs
  • Safety and advisory symbols
  • Safety instructions
  • Specifications
  • Installation tips
  • Installing multiple conductors in a single CT
  • Installing parallel-connected CTs for 200A services and in crowded service panels

Specifications

CT typeSplit core
CT accuracy (error rate)<1%
Maximum primary current100A
Turns ratio2500
Dimensions40.1 x 26.4 x 26.7 mm
Aperture9.8 mm diameter
Maximum conductor size support16mm2
CT lead wire length4m
Primary voltage250VAC
Frequency50-60Hz
Operating temperature-40 to 85 degree C
ComplianceCE, RoHS compliant
Connection tightening torque0.56 Nm

Frequently asked questions

What accuracy does the CT-100-SPLIT-ROW provide?

The document states a CT accuracy (error rate) of less than 1%.

What is the maximum primary current of the CT?

The maximum primary current is 100A.

Which direction must the arrow point for production monitoring?

For production monitoring, the arrow must point toward the load, away from the solar array.

What torque should the CT connections be tightened to?

Tighten all connections to 0.56 Nm.

Download PDF (241 KB)

More Enphase Manuals


View all Enphase manuals →