The Cisco Catalyst Blade Switch 3130 and 3032 Getting Started Guide for Dell provides information on how to install and set up the switch in a Dell Modular Server Chassis.
This guide provides instructions on how to install the Cisco Catalyst Blade Switch 3130 for Dell and the Cisco Catalyst Blade Switch 3032 for Dell in the Dell Modular Server Chassis. It also covers how to set up and configure the switch, including management options and troubleshooting help. The Dell Modular Server Chassis supports up to sixteen server modules and up to six Ethernet switches.
| Ports 1 to 16 | Internal Gigabit Ethernet 1000BASE-X downlink ports |
|---|---|
| Ports 17 to 20 | External 10/100/1000BASE-T copper Gigabit Ethernet uplink ports |
| Ports 21 to 24 | 10-Gigabit Ethernet module slots |
| Internal 100BASE-T Port | Used only for switch management traffic |
Yes, you do not need to power down the server chassis when installing the switch.
The maximum recommended ambient temperature is 113°F (45°C).