Huawei PDU8000 Power Distribution Box-T Quick Guide

PDU8000 Power Distribution Box-T Quick Guide, introduces the function features, usage methods and installation and maintenance precautions of the distribution box.


Huawei PDU8000 Power Distribution Box-T Quick Guide - cover page
Brand
Huawei
Document type
Quick Start Guide
Language
English
Pages
2
File format
PDF
File size
512 KB
Published
03 November, 2023
Updated
03 November, 2023
Model
PDU8000
MD5 checksum
A665981C5347C3EAD79D2F4A72A05F84

About this manual

This quick guide from Huawei covers the PDU8000 Power Distribution Box-T, a data center power distribution box. It starts with safety precautions on local regulations, personnel requirements and human safety, then explains how the model name of a power distribution box is composed.

The guide lists the tools needed for installation and the recommended tightening torque of bolts, shows the front layout of the box with its terminal blocks, and describes checking before installation, mounting the box on a wall with expansion bolts, installing cables, and the checklists to complete before power-on.

What's inside

  • Precautions / Safety Precautions
  • Local Safety Regulations
  • Personnel Requirements
  • Human Safety
  • Model Description
  • Tools
  • Power Distribution Box Layout
  • Checking Before Installation
  • Installing the Box
  • Installing Cables

Specifications

Box dimensions (H x W x D)150 mm x 200 mm x 100 mm
Rated voltage (V4)380 V to 415 V
Rated voltage (V5)480 V
Rated voltage (V7)200 V to 220 V
Recommended cable size22AWG
Cable routingCables routed in and out from the top

Frequently asked questions

Who is allowed to install the PDU8000 power distribution box?

Only trained and qualified personnel who understand basic safety precautions may install, operate and maintain the equipment.

How is the power distribution box mounted on the wall?

Drill holes with a hammer drill and install expansion bolts, fit the two holes on the box over the bolts, move the box downwards and tighten the two bolts.

Does Huawei provide the cables?

No. Cables must be prepared before installation, and 22AWG cables routed through a pipe are recommended.

What is checked before power-on?

After installation, the electrical connection, hardware installation and cable installation checklists must be verified before power-on.

Download PDF (512 KB)

More Huawei Manuals


View all Huawei manuals →