Enphase Encharge 3 / Encharge 10 Storage System Quick Install Guide

Enphase Encharge 3™ storage system installation guide, including installation precautions, system components, etc.


Enphase Encharge 3 / Encharge 10 Storage System Quick Install Guide - cover page
Brand
Enphase
Category
Power Management
Document type
Installation Guide
Language
English
Pages
8
File format
PDF
File size
1.4 MB
Published
02 November, 2023
Updated
02 November, 2023
MD5 checksum
C45EADBFDA714FA7ABEB553C17421022

About this manual

This quick install guide from Enphase Energy covers installation of the Encharge 3 and Encharge 10 storage systems (models ENCHARGE-3-1P-NA and ENCHARGE-10-1P-NA) and the wall-mount bracket. The Encharge system includes Encharge Batteries with integrated IQ Microinverters, and works with the IQ Envoy gateway and Enpower smart switch to charge and discharge the battery and provide backup power. The guide states that only qualified electricians may install, troubleshoot, or replace the units, and that all installations must comply with national and local electrical codes.

The guide lists required components and tools, including the Enpower smart switch, IQ Combiner, COMMS-KIT-01 wireless kit, lifting handles, fasteners, copper conductors and conduit fittings, and warns to verify that main service is 120/240 VAC. It also describes five installation scenarios: whole home backup with Enpower as service entrance (PV combiner connected to Enpower or to the main load panel), partial home backup with the main load panel as service entrance (PV combiner connected to Enpower or to the subpanel), and self consumption without an Enpower smart switch.

What's inside

  • Preparation
  • Safety warnings
  • Required Enphase items for backup systems
  • Required tools and fasteners
  • Whole home backup with Enpower as service entrance
  • Partial home backup with main load panel as service entrance
  • Self consumption, no Enpower smart switch
  • Installation scenarios

Specifications

Encharge Battery unit weight44.2 kg / 97.4 lbs (two persons required to lift)
Required main service voltage120/240 VAC (not 208/120 VAC)
PV circuit breaker supported (whole home backup)Up to 80A for PV circuit and 80A for battery storage
Terminal conductorsNo. 14 - 8 AWG copper conductors, 75°C or 90°C rated, 11 mm strip length
Conduit hubs3/4 inch (left side) and 1/2 inch (right side); NEMA Type 3R outdoors
Bracket fastenersSingle-wide: three 1/4" lag bolts, 7.6 cm long; triple-wide: nine

Frequently asked questions

Can the Encharge storage system provide backup power during an outage?

Yes, Encharge storage systems can provide backup power when an Enphase Enpower smart switch is installed at the site. Without Enpower, PV and Encharge will not operate when the grid is unavailable.

Can Encharge batteries be installed on a 208 VAC service?

No. Encharge batteries cannot be installed where L1 to L2 measures 208 VAC; the main service must be 120/240 VAC.

Who is allowed to install or replace the Encharge 3 or Encharge 10?

Only qualified electricians shall install, troubleshoot, or replace the Encharge 3 or Encharge 10.

What is included in the Encharge 10 kit?

The Encharge 10 includes three batteries, two inter-unit raceways, an Encharge 10 triple-width cover, and a triple-width mounting bracket.