Fuji Electric FRENIC-Multi High Performance Compact Inverter Starting Guide

This document is a user manual for FRENIC-Multi high performance compact inverter. It mainly introduces the safety information, installation, wiring, operation and debugging of the inverter.


Fuji Electric FRENIC-Multi High Performance Compact Inverter Starting Guide - cover page
Brand
Fuji Electric
Category
inverter
Document type
Quick Start Guide
Language
English
Pages
54
File format
PDF
File size
2 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
5DD22DBC7E8982F7F69F44E0A976C1D5

About this manual

This starting guide covers the Fuji Electric FRENIC-Multi high performance compact inverter for three-phase 400 V, three-phase 200 V, and single-phase 200 V applications. It explains safety information, mechanical installation, wiring, keypad operation, and quick-start commissioning.

The guide also includes function codes and application examples, troubleshooting, specifications and external dimensions, and available options. It should be read before installation, wiring, operation, maintenance, or inspection.

What's inside

  • Safety information and conformity to standards
  • Mechanical installation
  • Wiring
  • Operation using the keypad
  • Quick start commissioning
  • Function codes and application examples
  • Troubleshooting
  • Specifications and external dimensions
  • Options

Specifications

Three-phase 400 V class power range0.4 kW to 15 kW
Three-phase 200 V class power range0.1 kW to 15 kW
Single-phase 200 V class power range0.1 kW to 2.2 kW

Frequently asked questions

Can the FRENIC-Multi be used with single-phase motors?

No. It is designed to drive a three-phase induction motor and should not be used for single-phase motors or other purposes.

What protection device should be inserted in the power supply path?

Insert a recommended moulded case circuit breaker (MCCB) or residual-current-operated protective device (RCD)/earth leakage circuit breaker (ELCB) with overcurrent protection.

How long should power be off before inspection?

Turn the power off and wait for at least five minutes before starting inspection.

What voltage check is required before inspection?

Check that the DC link bus voltage between the P (+) and N (-) terminals is lower than 25 VDC.

Download PDF (2 MB)

More Fuji Electric Manuals


View all Fuji Electric manuals →