ABB Relion 615 Series Protection and Control Device Installation Manual

This manual introduces the installation steps of Relion protection measuring and control device 615 series.


ABB Relion 615 Series Protection and Control Device Installation Manual - cover page
Brand
ABB
Category
power system
Document type
Installation Guide
Language
Chinese
Pages
68
File format
PDF
File size
6.3 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
F48AD13F18B19CE035A49817A8208264

About this manual

This installation manual for the ABB Relion 615 Series protection and control device covers the product overview, safety information, environmental factors, unpacking and inspection, storage, installation, and connections. It also covers dismantling, repair and replacement, technical data, accessories and ordering parameters, and a glossary.

The wiring section states that all connections are made at the rear of the case and gives wire sizes for signal interfaces, CT/VT screw-compression terminals, and the optional RS-485 communication module terminals. This manual is written in Chinese.

What's inside

  • Overview
  • Environmental factors and sustainability
  • Unpacking, inspection and storage
  • Installation
  • Connections
  • Dismantling, repair and replacement
  • Technical data
  • Accessories and ordering parameters
  • Glossary

Specifications

Signal interface wire size (X100, X110, X130)0.5...2.5 mm2 with one wire, or 0.5...1.0 mm2 with two wires
Signal interface X120 wire sizeMaximum 2.5 mm2
CT/VT screw-compression terminal wire size0.5...6.0 mm2 with one wire, or maximum 2.5 mm2 with two wires
RS-485 communication module terminal wire size0.08...1.5 mm2 with one wire, or maximum 0.75 mm2 with two wires
CT/VT terminal toolPhillips PH1 cross-head screwdriver, M3.5

Frequently asked questions

Who is allowed to perform electrical installation?

Only qualified electricians may perform electrical installation.

What hazard can remain after auxiliary power is switched off?

Dangerous voltage may still be present at the terminals even when auxiliary power has been switched off.

What tool is needed for the CT/VT screw-compression terminals?

A Phillips PH1 cross-head screwdriver (M3.5) is required.

Where are all wiring connections made?

All wiring connections are made at the rear of the case, and no soldering is required.

Download PDF (6.3 MB)

More ABB Manuals


View all ABB manuals →