This document is an installation manual, which introduces the installation and operation methods of Enphase IQ 7, IQ 7+ and IQ 7X Micros
This manual provides instructions for the installation and operation of the Enphase IQ 7, IQ 7+, and IQ 7X Microinverters. It is intended for professional installation and maintenance personnel and covers safety requirements, system planning, and compatibility notes. Key requirements include the use of the Enphase Q Cable and an IQ Envoy for monitoring.
| Maximum Branch Circuit Breaker/Fuse | 20 A |
|---|---|
| Maximum Operating Temperature | 90° C |
Enphase IQ Series Microinverters require the Q Cable and are not compatible with previous Enphase cabling.
Yes, an IQ Envoy is required to monitor the performance of the IQ Microinverters.
Only qualified personnel should install, troubleshoot, or replace Enphase Microinverters or Enphase Q Cable and Accessories.