This document is a start-up guide for the NGC8200 Measurement and Control System from ABB Inc., Totalflow Products. The guide provides basic information on the installation and start-up of the product, as well as installation instructions for optional equipment. It is recommended that inexperienced technicians follow the installation procedures as described in the guide.
This document is a Chinese quick-start guide for the ABB Totalflow NGC8200 Measurement and Control System. It is intended for typical installations and recommends experienced technicians consult the full User Manual for detailed information. The guide advises reading it before starting installation to understand the provided procedures.
The guide details the physical installation steps, including finding a suitable location near the sample probe, mounting the device on various surfaces (wall, shelf, pipe), and installing the sample conditioning module and probe. It specifies requirements for tubing materials (stainless steel), gas purity, and pressure settings for carrier, calibration, and sample lines. It also covers connecting ventilation, power supply, and installing the PCCU32 software. This manual is written in Chinese.
| Carrier Gas Purity | 99.995% or higher |
|---|---|
| Sample Line Length (with conditioner) | Up to 50 feet |
| Sample Line Length (without conditioner) | Up to 10 feet |
| Carrier Gas Pressure Setting | 90 PSIG |
| Sample Probe Pressure Setting | 15 PSIG |
| 12V System Min Voltage (J1) | 11.5 VDC |
| 24V System Min Voltage (J1) | 25 VDC |
Only high-quality all-stainless steel chromatographic grade transmission tubes should be used for carrier, calibration, and sample lines.
If a leak occurs in the carrier, sample, or calibration gas lines, the equipment will produce non-compliant results.
The PCCU32 software located on the included CD must be installed on the device.