This is an installation manual for automatic pool filler. It covers the installation process, pre-installation requirements, precautions and maintenance.
This document provides installation instructions for the Pentair T40-B automatic pool leveler. It details the steps for installing the leveler bucket, connecting the equalizer and supply pipes, and assembling the brass valve. Important warnings regarding pipe angles and tightening are included to ensure proper function and warranty coverage.
The guide includes a diagram showing the connection of the 3/4" fresh water supply pipe and the 3/4" overflow pipe. It also explains how to adjust the water level using the brass float arm and wind screw.
| Supply Pipe Size | 3/4" |
|---|---|
| Overflow Pipe Size | 3/4" |
| Test Plug Size | 3/8" |
| Flush Duration | 60 seconds |
Loosen the wind screw on the brass float arm, adjust up or down, and tighten when the water level is achieved.
You must connect a 3/4" fresh water supply pipe to the side leveler bucket.
Flush the supply line for approximately 60 seconds or until all debris has cleared.