Agilent Saturn 2000 GC/MS Pre-Installation Instructions

This file introduces the installation requirements of Varian Saturn GC/MS, including space and weight requirements, power requirements, operating environment requirements, temperature/humidity requirements, particulate matter requirements, vibration requirements, exhaust system requirements, etc.


Agilent Saturn 2000 GC/MS Pre-Installation Instructions - cover page
Brand
Agilent
Document type
Installation Guide
Language
English
Pages
9
File format
PDF
File size
318 KB
Published
07 June, 2012
Updated
30 September, 2023
MD5 checksum
7A16A87292D8201A528552F77F78F4A8

About this manual

This document provides guidance on identifying and preparing a suitable installation site for the Agilent Saturn 2000 GC/MS system. It details specific requirements for space dimensions, weight capacity of workbenches, and necessary clearances around the instrument components to ensure safe operation and maintenance access.

The guide also outlines critical power requirements, including dedicated fourplex single-phase power sources with earth grounds, voltage ranges (100-130 Vac or 200-260 Vac), and amperage limits for various system components. Additionally, it specifies the necessary operating environment parameters, such as temperature (18° to 21 °C) and relative humidity (40% to 80%), along with ventilation and exhaust system considerations.

What's inside

  • Space and Weight Requirements
  • Power Requirements
  • Operating Environment
  • Temperature/Humidity
  • Exhaust System
  • Gas Requirements
  • Network Requirements
  • Computer/Printer Requirements

Specifications

Optimum Operating Temperature18° to 21 °C (65° and 70 °F)
Relative Humidity Range40% to 80%
Mass Spectrometer Power Rating (120V)12A
CP-3800 Gas Chromatograph Power Rating (120V)20A
Average Steady-State Heat Load6000 BTUs

Frequently asked questions

What are the space and weight requirements for the Saturn GC/MS components?

Table 1 in this document identifies specific dimensions (Height, Width, Depth) and weights for each component, such as the Saturn MS weighing 66 lb.

What power sources are required for installation?

Two dedicated fourplex single-phase power sources with earth grounds hard-wired to the main power panel ground are required.

What is the recommended vertical clearance above the mass spectrometer?

An additional 76 cm (30 in.) of vertical clearance is required to allow for routine maintenance.

Download PDF (318 KB)

More Agilent Manuals


View all Agilent manuals →