YASKAWA J1000 AC Drive Installation & Start-Up Manual

This manual provides the steps for installing and starting up the YASKAWA AC Drive J1000 Compact V/f Control Drive. It provides information on the drive specifications, parameter list, standards compliance, mechanical installation, electrical installation, start-up, programming and operation, troubleshooting, periodic inspection and maintenance.


YASKAWA J1000 AC Drive Installation & Start-Up Manual - cover page
Brand
YASKAWA
Category
Motor
Document type
Installation Guide
Language
English
Pages
248
File format
PDF
File size
6.8 MB
Published
16 March, 2012
Updated
30 September, 2023
Model
J1000
MD5 checksum
971BCCB3FEF0497F44CE31FAAC60C31F

About this manual

This manual provides step‑by‑step instructions for receiving, mechanically installing, and electrically wiring the YASKAWA J1000 AC drive. It includes safety guidelines, wiring diagrams, and detailed procedures for connecting peripheral devices and options.

The document also describes start‑up programming, operation modes, troubleshooting methods, periodic inspection, and maintenance tasks. Technical specifications, parameter lists, and standards compliance information are provided in the later sections.

What's inside

  • Receiving
  • Mechanical Installation
  • Electrical Installation
  • Start‑Up Programming & Operation
  • Troubleshooting
  • Periodic Inspection & Maintenance
  • Peripheral Devices & Options
  • Specifications
  • Parameter List
  • Standards Compliance

Specifications

200 V Class, Three‑Phase Input Power Range0.1 kW to 5.5 kW
200 V Class, Single‑Phase Input Power Range0.1 kW to 2.2 kW
400 V Class, Three‑Phase Input Power Range0.2 kW to 5.5 kW
Enclosure RatingIP20/Open‑Chassis

Frequently asked questions

How do I verify the drive model and nameplate after receiving it?

Check the Model Number and Nameplate in Section 1.2 "Model Number and Nameplate Check" of the manual.

Where can I find the wiring diagrams for the main circuit?

The wiring diagrams are in the Electrical Installation chapter, sections 3.2 "Standard Connection Diagram" and 3.3 "Main Circuit Connection Diagram".

What is the procedure for a no‑load operation test?

Perform the test as described in Section 4.7 "No-Load Operation Test".

Download PDF (6.8 MB)

More YASKAWA Manuals


View all YASKAWA manuals →