Haier household air conditioner KFR-50LW/02D(R2DBPF)-S2 KFR-72LW/02D(R2DBPF)-S2makeuse installation Manual

This is a user manual for Haier air conditioner, which mainly introduces the installation, use and maintenance methods of Haier air conditioner


Haier household air conditioner KFR-50LW/02D(R2DBPF)-S2 KFR-72LW/02D(R2DBPF)-S2makeuse installation Manual - cover page
Brand
Haier
Category
Air conditioner
Document type
Installation Guide
Language
Chinese
Pages
2
File format
PDF
File size
2.4 MB
Published
25 February, 2012
Updated
30 September, 2023
MD5 checksum
25519C4B913F299641CD24B7A9D27F62

About this manual

This manual provides step‑by‑step instructions for installing the Haier split‑type air‑conditioner units, including vacuuming the refrigerant lines, connecting power and communication cables, and routing the indoor‑outdoor piping. Safety precautions, required power specifications, and recommended tools are detailed to ensure a correct and safe installation.

The document also covers basic operation features such as timer settings, auxiliary electric heating, cleaning and maintenance procedures, and warranty information. Users are guided on how to set the timer, enable quiet or strong modes, and perform regular filter cleaning to keep the unit running efficiently. This manual is written in Chinese.

What's inside

  • Technical Data
  • Installation Instructions
  • Electrical Connection
  • Vacuum Process
  • Pipe Routing
  • Operation Guide
  • Timer Function
  • Auxiliary Heating
  • Cleaning and Maintenance
  • Safety Precautions

Specifications

Cooling Capacity (W) – KFR‑50LW5000 (1000‑5800)
Heating Capacity (W) – KFR‑50LW6400 (1000‑8000)
Power Consumption (W) – KFR‑50LW2100 (200‑3140)
Indoor Unit Air Flow (m³/h)900 (KFR‑50LW) / 1150 (KFR‑72LW)

Frequently asked questions

What vacuum pressure is required before connecting the refrigerant lines?

Vacuum should be drawn for about 15 minutes until the low‑pressure side reads –0.1 kPa (‑76 cm Hg) or lower.

What power supply is needed for the indoor unit?

A single‑phase 220 V, 50 Hz AC supply is required.

How should the power lines be connected?

Connect L to the live (phase) conductor, N to neutral, and the earth wire to ground; keep earth and neutral separate.

Download PDF (2.4 MB)

More Haier Manuals


View all Haier manuals →