The global clock synchronization signal failed, violating time grid specifications in DP communication. The manual's first action is: “• Check the physical bus configuration (cable, connector, terminating resistor, shielding, etc.).”
- Model
- Siemens SINAMICS V90, SIMOTICS S-1FL6
- Display shows
- F1911
- Type
- Fault code
- Source
- Manual p. 289
What F1911 means
PROFIdrive: Clock cycle synchronous operation clock cycle failure p. 289
Common causes
- The global control telegram to synchronize the clock cycles has failed - for several DP clock cycles or has violated the time grid specified in the parameterizing telegram over several consecutive DP clock cycles (refer to the bus cycle time, Tdp and Tplw). p. 289
What to do
- • Check the physical bus configuration (cable, connector, terminating resistor, shielding, etc.). p. 289
- • Check whether communication was briefly or permanently interrupted. p. 289
- • Check the bus and controller for utilization level (e.g. bus cycle time Tdp was set too short). p. 289
Before you service the product, read the safety instructions in the manual p. 2.
If F1911 is still not resolved
- Contact service / dealer for assistance p. 2 “Qualified Personnel The product/system described in this documentation may be operated only by personnel qualified for the specific task in accordance with the relevant documentation, in particular its warning notices and safety instructions.”
- Contact service / dealer for assistance p. 13 “NOTICE Property damage due to loose power connections Insufficient tightening torques or vibration can result in loose power connections. This can result in damage due to fire, device defects or malfunctions.”
This page summarises what the manufacturer’s manual says about F1911; each statement links to the page it comes from, and quoted lines are copied word for word. It is not a substitute for the manual or for a qualified installer. ManualLib is not affiliated with Siemens. Found a mistake? Report an error.
