Netafim Techline Design Manual for Subsurface and On-Surface Irrigation Installations

Design manual covering layout, installation and maintenance of Netafim Techline integral dripperline using the grid layout method for subsurface and…


Netafim Techline Design Manual for Subsurface and On-Surface Irrigation Installations - cover page
Brand
Netafim
Category
Agricultural Machinery
Document type
Installation Guide
Language
English
Pages
11
File format
PDF
File size
239 KB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
20A6DB77E807AB4A6C75C6D691C51F4F

About this manual

This Techline design manual from Netafim covers the basics of design, installation, and maintenance of Techline Integral Dripperline using the "Grid" layout method to produce a complete wetted area. The design is intended for subsurface applications but can also be applied to on-surface installations. The manual includes design steps, technical data, design layouts, and design and installation details with checklists.

The document walks through site survey, point of connection, dripper flow rate and spacing selection, supply and exhaust header layout, center feed layouts, zone water requirement calculations, and line flushing valve placement. Reference tables give row spacing recommendations, maximum lateral lengths at various inlet pressures, and flow per 100 feet of Techline for 0.4, 0.6, and 0.9 GPH drippers.

What's inside

  • Purpose
  • Overview
  • Design Criteria
  • Site Survey
  • Point of Connection
  • Techline Layout
  • Basic Design Steps
  • Center Feed Layouts
  • Zone Water Requirements
  • Line Flushing Valves

Specifications

Dripper flow rates0.4 GPH, 0.6 GPH, 0.9 GPH
Dripper interval12" to 18" depending on soil type
Techline lateral spacing12" to 24" depending on soil type and application
Burial depthBury evenly throughout the zone to a maximum of 6"
Header velocity limitMaximum 5 feet per second
Techline header capacityUp to 5 GPM flow
Line flushing valve quantityOne per 15 GPM of zone flow

Frequently asked questions

How deep should Techline dripperline be buried?

Bury evenly throughout the zone to a maximum of 6 inches; on-surface installation is also possible.

How far should Techline rows start from hardscapes?

Start rows 2 inches away from hardscapes such as asphalt and 4 inches away from planting beds.

Where should a Line Flushing Valve be installed?

Install it in an inconspicuous area as far away from the source as possible, typically along the exhaust header, buried in a valve box with a gravel sump.

What is a grid layout in Techline design?

The supply header delivers water to each row of Techline and the exhaust header forms a continuous loop so all rows are supplied from both ends, which evens out flow and makes line break repairs easier.