Netafim Sandstorm™ SSIM V2.01 Metal Single/Double Chamber Media Filter Installation Guide

This manual is the installation manual of SANDSTORM™ Metal Single/Double Chamber Media Filter.


Netafim Sandstorm™ SSIM V2.01 Metal Single/Double Chamber Media Filter Installation Guide - cover page
Brand
Netafim
Category
Agricultural Machinery
Document type
Installation Guide
Language
English
Pages
24
File format
PDF
File size
4 MB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
864B75AC7250A81B9122E6DFCE1A6A24

About this manual

This installation guide provides step-by-step instructions for installing the Sandstorm™ metal single/double chamber media filter, including safety precautions, component identification, tool requirements, and grooved coupling connection methods. It also covers on-site preparations such as electrical and grounding connections, foundation requirements, and backwash pipe specifications. The guide emphasizes following installation drawings and using only original Netafim parts to ensure proper system operation.

The document includes sections on initial operation, troubleshooting, and warranty information, with detailed diagrams and measurements for tank dimensions and manifold support leg placements. It is intended for experienced technicians and includes warnings about pressure release and electrical safety.

What's inside

  • Introduction
  • Safety Instructions
  • General Instructions
  • Components and Structure
  • On-site Pre-installation Preparations
  • Tools Required for Installation
  • Grooved Coupling Connection
  • Installation
  • Installation Add-ons (Optional)
  • Initial Operation

Specifications

Maximum Working Pressure8 bar (116 PSI)
Grounding Connection≤ 10 Ω
Backwash Pipe Max Length20 m (65 ft)

Frequently asked questions

What is the maximum working pressure of the filtration system?

The maximum working pressure of the filtration system is 8 bar (116 PSI).

What tools are required for installation?

A standard full installer toolkit is adequate. An electric hammering drill and concrete drill bit are needed for connecting the control stand to the concrete slab. Specific wrenches are required for grooved couplings based on size.

How should the backwash pipe be installed?

The backwash pipe should be no longer than 20 m (65 ft), with a diameter never smaller than the backwash manifold. If longer than 33 ft, its diameter should be larger than the manifold. The pipe should not ascend above the manifold outlet elevation.

What is the grounding requirement for the electrical connection?

The grounding connection must be ≤ 10 Ω.

Download PDF (4 MB)

More Netafim Manuals


View all Netafim manuals →