Installation guide for James Hardie's ComTex™ facade panel and fixing system for commercial applications, covering framing, panel installation, movement…
This guide provides step-by-step instructions for installing the ComTex™ facade panel and fixing system in commercial buildings. It details the three-component system: panels, accessories, and texture coating (supplied separately). The guide covers framing methods, panel layout, jointing, movement joints, fixing, and fire-rated walls. It also includes important factors like texture coat thickness, gloss level, and color LRV requirements to ensure durability and visual finish. The system is designed to avoid the weight issues of traditional masonry while providing a monolithic texture-coated facade. This manual is written in Chinese.
| Texture Coating Thickness | Minimum 2mm |
|---|---|
| Light Reflective Value (LRV) | Greater than 40% |
A minimum 2mm thick texture coat is recommended to help conceal joints.
A low gloss finish is recommended to help diffuse glancing light.
The texture coating must be applied within 90 days of installation.