IMO ACG/UCG Screw Pump Maintenance and Service Instruction

Maintenance and service instruction for IMO ACG/UCG screw pumps covering service intervals, lubrication, rotor inspection, and dismantling procedures.


IMO ACG/UCG Screw Pump Maintenance and Service Instruction - cover page
Brand
IMO
Category
Other
Document type
Service Manual
Language
English
Pages
12
File format
PDF
File size
489 KB
Published
29 October, 2026
Updated
29 October, 2026
MD5 checksum
1F859F696AE9AA65314A20D174E62887

About this manual

This document provides maintenance and service instructions for IMO ACG/UCG screw pumps, including service intervals, lubrication intervals, inspection of rotors, dismantling, and reassembly. It also includes details about the pressure relief valve, an exploded view, ordering codes, and a list of components.

What's inside

  • List of components
  • Exploded view/Ordering code
  • Service intervals
  • Shaft seal/Service for ball bearing
  • Lubricating intervals/Useful tools
  • Inspection of rotors
  • Dismantling
  • Reassembly
  • Pressure relief valve

Specifications

Valid pump sizesACG/UCG 045/052/060/070
Rotor diameter and generationK7/N7
Maximum service interval3 years
Acceptable shaft seal leakageTen drops per hour
Maximum clearance between rotor and bores0.2 mm
Maximum clearance between rotor flanks0.4 mm

Frequently asked questions

What is the recommended maximum service interval for the pump?

It is recommended to have planned inspection and overhaul at regular intervals, not exceeding 3 years.

How much leakage is considered acceptable for the shaft seal?

Ten drops per hour can be considered as acceptable leakage.

Download PDF (489 KB)

More IMO Manuals


View all IMO manuals →