This manual provides instructions for the installation, wiring, operation, maintenance, and troubleshooting of industrial fans.
This document serves as an operation guide for fans, covering special precautions, receiving inspection, installation preparation, and wiring methods. It details the correct procedures for installing the fan, connecting the power supply, and starting the equipment for the first time. This manual is written in Chinese.
The fan bearings should be oiled at least once every 1000 hours of operation.
The insulation resistance between the fan casing and motor winding must be greater than 0.5 MΩ.
For fans with power greater than 11KW, a voltage reduction starting method is recommended.