Generator Set Monitoring System Arduino SMS Final Project Report

This document describes a system for monitoring a generator set. The system uses sensors to monitor the parameters of the generator set and sends the data to a central controller. The central controller analyzes the data and takes the necessary steps to keep the generator set running properly.


Generator Set Monitoring System Arduino SMS Final Project Report - cover page
Category
Generator
Document type
Other
Language
ID
Pages
7
File format
PDF
File size
293 KB
Published
07 November, 2023
Updated
07 November, 2023
MD5 checksum
410985A8A3C9FE27AABA0698D09073D3

About this manual

Chapter 1 of a Laporan Tugas Akhir from STT Telematika Telkom Purwokerto discusses manual generator set monitoring and proposes an Arduino Uno-based prototype. The prototype uses a voltage sensor and a modem to send SMS reports to a cell phone, so generator set status can be checked remotely.

The chapter covers the background, problem formulation, objectives, benefits, scope, relation to telecommunications, and research methodology. It defines observed conditions for the generator set, including whether it starts and whether it produces output voltage.

What's inside

  • Pendahuluan
  • Latar Belakang
  • Perumusan Masalah
  • Maksud dan Tujuan Penulisan
  • Manfaat Penulisan
  • Batasan Masalah
  • Kaitan Judul dengan Teknik Telekomunikasi
  • Metodologi Penelitian
  • Parameter yang Diamati
  • Rencana Kerja

Specifications

MicrocontrollerArduino Uno
SensorVoltage sensor
Reporting methodSMS via modem

Frequently asked questions

What microcontroller is used in the prototype?

The prototype uses an Arduino Uno as the microcontroller for monitoring generator set voltage.

What sensor is used to monitor the generator set?

The design uses a voltage sensor to monitor generator set performance.

What parameters are observed?

The observed parameters are whether the generator set starts and whether it does not start.

Why is the monitoring system needed?

Generator set monitoring during failures is still done manually, so the project aims to make monitoring more effective and efficient.

Download PDF (293 KB)

Also Manuals