MARKES MKIUNITY2 Installation Manual

This manual describes how to install the UNITY 2, including pre-installation checks and installation steps.


MARKES MKIUNITY2 Installation Manual - cover page
Brand
MARKES
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
18
File format
PDF
File size
2.4 MB
Published
05 July, 2012
Updated
30 September, 2023
Model
UNITY 2
MD5 checksum
2043CD9D2E834EC4C89B55D6346BFA58

About this manual

This manual provides instructions for installing the Markes UNITY 2 thermal desorption system. It details pre-installation requirements, including minimum computer specifications and laboratory environment needs such as air quality and gas line quality. The guide covers unpacking the unit and preparing the Gas Chromatograph (GC) for connection.

What's inside

  • Pre-installation Check List
  • Minimum computer specification
  • GC equipment requirements
  • Laboratory location
  • Services (Power, Gas)
  • Unpacking UNITY 2
  • Installing the transfer line
  • Connecting the transfer line to UNITY 2
  • Installing the software
  • Installation Checklist

Specifications

Minimum CPU400MHz Pentium
Minimum RAM64 MB
Minimum Free Disk Space20 MB
Operating SystemWindows 95, 98, ME, 2000, NT4, XP (32-bit) and Vista (32-bit)
Minimum Resolution800x600
Power Consumption650 W
Transfer Line Length1 m
Transfer Line ID0.25 mm

Frequently asked questions

What are the minimum computer specifications for UNITY 2 control?

The minimum requirements are a 400MHz Pentium CPU, 64 MB RAM, and 20 MB free disk space.

What operating systems are compatible with UNITY 2?

Compatible operating systems include Windows 95, 98, ME, 2000, NT4, XP (32-bit), and Vista (32-bit).

What is the maximum power consumption of UNITY 2?

The maximum power consumption of the UNITY 2 unit is 650 W.

What purity of carrier gas is recommended for UNITY 2?

5.0 grade (99.999%) or higher purity helium or nitrogen gas is recommended.

Download PDF (2.4 MB)

More MARKES Manuals


View all MARKES manuals →