tps5420evm-175 is the evaluation module of tps5420 power converter, which supports 5.5v to 36v input voltage and maximum output current of 2a. it can be used to demonstrate the characteristics of tps5420 power converter.
This guide provides background information, performance specifications, and detailed documentation for the TPS5420EVM-175 SWIFT regulator evaluation module. It includes the module’s schematic, bill of materials, board layout, and test setup procedures.
The document also describes the module’s electrical characteristics such as input voltage range, output current capability, switching frequency, efficiency, and various test results like load regulation, line regulation, and transient response.
| Input voltage range | 10 V to 36 V |
|---|---|
| Output voltage set point | 5.0 V |
| Switching frequency | 500 kHz |
| Loop bandwidth | 25.0 kHz |
| Phase margin | 55 ° |
| Output ripple voltage | 32 mVpp |
| Output rise time | 7 ms |
| Load transient recovery time | 200 µs |
The module operates with an input voltage from 10 V to 36 V.
The internal switching frequency is set to 500 kHz.