Huawei SUN2000 8KTL-28KTL Inverter User Manual
The document serves as a user guide for the Huawei SUN2000 series of three-phase string grid-tied photovoltaic (PV) inverters. It provides comprehensive instructions for operators and qualified electrical technicians on how to install, connect, configure, and maintain these devices in commercial rooftop or large-scale power station systems. This manual is written in Chinese.
Read onlineHuawei SUN2000 specifications
| Product Type | Three-phase string grid-tied PV inverter |
|---|---|
| Power Range | 8kW to 27.5kW |
| Target Audience | PV power station operators and qualified electrical technicians |
All Huawei SUN2000 documents by type
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
- Huawei SUN2000-20KTL/29.9KTL/30KTL/36KTL/40KTL-M3 User Manual 100 p
- Huawei SUN2000 8KTL-28KTL Inverter User Manual 128 p
- Huawei SUN2000-175KTL-H0/185KTL-INH0/185KTL-H1 Inverter User Manual 119 p
- Huawei SUN2000 Smart PV Optimizer User Manual 28 p
- Huawei SUN2000-5KTL-M0/6KTL-M0 User Manual 95 p
- Huawei SUN2000-(2KTL-6KTL)-L1 User Manual 119 p
- SUN2000-(3KTL-12KTL)-M0 User Manual 75 p
- Huawei SUN2000-8KTL-20KTL-M2 Inverter User Manual 117 p
- Huawei SUN2000-36KTL/42KTL PV Inverter User Manual 107 p
Questions answered in these manuals
What personnel are authorized to install and maintain the SUN2000?
Only trained and qualified personnel are allowed to install, operate, and maintain the equipment.
From: Huawei SUN2000-20KTL/29.9KTL/30KTL/36KTL/40KTL-M3 User Manual
What must be done with packaging materials after the equipment is installed?
Remove all unused packaging materials such as boxes, foam, plastics, and cable ties from the area where the equipment is placed.
From: Huawei SUN2000-20KTL/29.9KTL/30KTL/36KTL/40KTL-M3 User Manual
Who is the intended audience for this manual?
This manual is suitable for PV power station operators and electrical technicians with corresponding qualifications.
What safety distance is required during installation?
The inverter requires a minimum clearance of 200mm on the left and right, 500mm above, 300mm below, and 1000mm in front.
What is the SUN2000 inverter used for?
The manual explains that this device converts direct current to three-phase alternating current.
From: Huawei SUN2000-175KTL-H0/185KTL-INH0/185KTL-H1 Inverter User Manual
How many PV string inputs does the inverter accept?
The inverter accepts 18 PV string inputs internally combined into 9 MPPT circuits.
From: Huawei SUN2000-175KTL-H0/185KTL-INH0/185KTL-H1 Inverter User Manual