This manual covers the installation, electrical connection, commissioning, maintenance, and troubleshooting for Huawei SUN2000 string inverters ranging from…
The document serves as a user guide for the Huawei SUN2000 series of three-phase string grid-tied photovoltaic (PV) inverters. It provides comprehensive instructions for operators and qualified electrical technicians on how to install, connect, configure, and maintain these devices in commercial rooftop or large-scale power station systems. This manual is written in Chinese.
| Product Type | Three-phase string grid-tied PV inverter |
|---|---|
| Power Range | 8kW to 27.5kW |
| Target Audience | PV power station operators and qualified electrical technicians |
This manual is suitable for PV power station operators and electrical technicians with corresponding qualifications.
The inverter requires a minimum clearance of 200mm on the left and right, 500mm above, 300mm below, and 1000mm in front.