Key facts
- Brand
- Hisense
- Model
- 36FZBp
- Category
- Air conditioner
- Documents
- 5
- Languages
- ZH
- Last added
- 2023-11-18
Start here

Hisense KFR-35GW/36FZBp Air Conditioner User and Installation Manual
This is the user and installation manual for the Hisense KFR-35GW/36FZBp split heat-pump inverter wall-mounted room air conditioner. It describes features such as microcomputer control, a 24-hour on/off timer, strong dehumidification, compact appearance, quiet operation, digital DC inverter control, automatic airflow direction, and automatic plus three fan speeds.
The manual also provides safety precautions for installation, wiring, and repair; unit composition; an operation guide; maintenance and cleaning; troubleshooting; a refrigerant circuit diagram; installation instructions; and main product specifications. This manual is written in Chinese.
Hisense 36FZBp specifications
| Rated power supply voltage | AC 220V |
|---|---|
| Rated power supply frequency | 50 Hz |
| Cooling capacity (KFR‑50LW) | 5.0 kW (1.5/2.5/6.5 kW) |
| Heating capacity (KFR‑72LW) | 9.0 kW (2.5/4.5/10.9 kW) |
| SEER (cooling efficiency) | 4.35 W/W |
| HSPF (heating efficiency) | 2.95 W/W |
| Indoor unit noise level | 33 dB(A) – 44 dB(A) |
Source: Hisense KFR-50LW/36FZBp KFR-72LW/36FZBp Installation Manual
All Hisense 36FZBp documents by type
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in these manuals
Who may wire the air conditioner?
Only qualified electricians may wire it, and all wiring work should follow relevant electrical regulations.
From: Hisense KFR-35GW/36FZBp Air Conditioner User and Installation Manual
What should be done if the air conditioner operates abnormally?
Stop operation, unplug the power plug or cut power, and contact the company's after-sales service or designated repair outlet.
From: Hisense KFR-35GW/36FZBp Air Conditioner User and Installation Manual
What should be checked before starting the installation?
Verify that the site’s power voltage matches the voltage printed on the unit’s nameplate, ensure a qualified installer performs the work, and confirm that reliable grounding and protective devices are in place.
From: Hisense KFR-50LW/36FZBp KFR-72LW/36FZBp Installation Manual
What safety precautions must be taken before installing the air conditioner?
Installation should be performed by qualified technicians, the supply voltage must match the nameplate, proper grounding is required, and the outdoor unit must not be placed near seawater or sulfur‑containing gases.
What does the automatic wind‑direction feature do?
It continuously changes the angle of the wind‑gate blades so that air is distributed to all corners of the room.
