Key facts
- Brand
- Apple
- Model
- Xserve (Late 2006
- Category
- Servers Computer
- Documents
- 2
- Languages
- EN
- Last added
- 2012-06-05
Start here

Apple Xserve (Late 2006/Early 2008) Enclosure Replacement Instructions
This document provides step-by-step replacement instructions for various components of the Apple Xserve server (Late 2006/Early 2008). It covers procedures for removing the unit from a rack, replacing the main enclosure while transferring internal parts like power supplies and logic boards, and swapping out hard drives or power supply units. The guide emphasizes safety precautions regarding static electricity and hot components.
Read onlineAll Apple Xserve (Late 2006 documents by type
Disassembly, diagnostics and part numbers, for repair.
Questions answered in these manuals
Can I remove hard drives while the server is running?
Yes, you can replace hard drives while the system is running without shutting down or opening the server first.
From: Apple Xserve (Late 2006/Early 2008) Enclosure Replacement Instructions
What happens if I remove a drive when it is active?
To avoid losing data, never remove a drive when the lower LED on the front of the drive is blinking.
From: Apple Xserve (Late 2006/Early 2008) Enclosure Replacement Instructions
What tools are required for this procedure?
A Phillips #1 screwdriver, an antistatic wrist strap (if available), thermal grease syringes, and alcohol wipes.
From: Apple Xserve Late 2006 Early 2008 Rear ID Tab Replacement Instructions
How long should the server cool before opening?
You must let it cool down for 5 to 10 minutes before you open it.
From: Apple Xserve Late 2006 Early 2008 Rear ID Tab Replacement Instructions
