Grundfos UPS/UPSD Series 200 Circulator Pump Installation and Operating Instructions

Installation and operating instructions for Grundfos UPS/UPSD Series 200 circulator pumps, covering installation, electrical connection, startup…


Grundfos UPS/UPSD Series 200 Circulator Pump Installation and Operating Instructions - cover page
Brand
Grundfos
Category
AC Motors
Document type
Installation Guide
Language
Chinese
Pages
26
File format
PDF
File size
3 MB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
9A1881A1FC3576F84A72BC231B9AC1E0

About this manual

This manual provides installation and operating instructions for the Grundfos UPS/UPSD Series 200 circulator pumps. It covers safety information, receiving and inspecting the product, installation requirements, electrical connections for single-head and twin-head pumps with standard or relay modules, startup procedures, storage, handling, frost protection, control functions, troubleshooting, technical data, and disposal.

The document includes detailed guidance on terminal box positioning, flow direction, flange bolt torques, lifting methods, and warnings against frequency converter use. It also describes alternating and standby operation modes for twin-head pumps, and provides fault and operation indication wiring diagrams. This manual is written in Chinese.

What's inside

  • General Information
  • Receiving the Product
  • Installing the Product
  • Starting the Product
  • Storing and Handling the Product
  • Product Introduction
  • Control Functions
  • Troubleshooting
  • Technical Data
  • Product Disposal

Specifications

Installation environmentIndoor only

Frequently asked questions

What are the recommended flange bolt torques for M12 and M16 bolts?

M12 bolts should be tightened to 27 Nm and M16 bolts to 66 Nm.

Can the pump be operated with a frequency converter?

The manufacturer does not recommend frequency converter operation due to increased noise, voltage peaks shortening motor insulation life, and incorrect indicator lights on three-phase pumps.

What must be done before starting the pump?

The system must be filled with liquid and vented, and the minimum required inlet pressure must be reached.

Download PDF (3 MB)

More Grundfos Manuals


View all Grundfos manuals →